Skip to content

EverRay Solar

Professional Solar Panel, Inverter & Energy Storage Supplier & Solutions Provider

  • Home
  • About Us
  • Factory Tour
  • Certifications
  • Products
    • Solar Modules
    • Hybrid Inverters
      • 60kW Hybrid Inverter — Three Phase for Commercial & Industrial Projects
    • LiFePO4 Batteries
    • Home Energy Storage
    • Commercial ESS
    • Solar Pump Systems
    • EV Chargers
    • Solar Lighting
    • PV Cleaning Machines
    • Product Catalogue (PDF)
  • Projects
  • Distributors
  • Contact Us
  • Home
  • Solar Battery Supplier Ghana: Duty, EasyPass and Landed Cost

Solar Battery Supplier Ghana: Duty, EasyPass and Landed Cost

EverRay supplies solar modules, hybrid inverters and LiFePO4 battery systems to Ghanaian installers, distributors and industrial buyers — MOQ from one pallet or one unit, 1–2 week dispatch on stock configurations, and two storage projects already delivered inside Ghana: a 30 kW / 100 kWh hybrid system and a 450 kW / 460 kWh commercial system, both 2025. This page is about the part that decides whether your container makes money: what the battery actually costs landed in Tema, what the GSA EasyPass regime now requires before shipment, and how to size for dumsor instead of guessing.

Quick facts for Ghanaian buyers

  • MOQ 1 pallet / 1 unit / 1 set
  • 1–2 weeks production and dispatch
  • 230/400 V, 50 Hz — standard EU configuration, no 60 Hz conversion
  • Ghana references: 30 kW/100 kWh and 450 kW/460 kWh
  • GSA EasyPass mandatory on HS chapter 85 shipments from 1 July 2026

WhatsApp landed-cost quoteJump to the cedi arithmetic

Why Ghana is a storage market, not just a solar market

Ghana’s problem is not panel price. It is that the grid cannot be relied on to carry a business through the working day, and the equipment that fixes that is a battery, not another row of modules. That single fact shapes the whole buying decision, because the customer is not buying kilowatt-hours of generation — they are buying hours of continuity.

The numbers behind it:

IndicatorFigureWhat it means for your order
Installed solar capacityAround 205 MW (2024), against a government target of 400 MW for 2026The market is doubling on policy intent, and almost all of that growth needs storage to be useful after 18:00
Supply structureAn estimated 85–95% of batteries are imported; there is no meaningful domestic cell manufacturing, only small pack assembly in Accra and KumasiYou are competing on sourcing and landed cost, not on local production
Embedded generationNet metering and embedded generation permits are capped at 500 kW per customerSystems above 500 kW are structured as captive or off-grid — the sizing conversation changes at that line
Load sheddingRotating outages (“dumsor”) remain a live planning assumption; ECG and GRIDCo published rotation timetables through 2026Every commercial quote in Ghana is really a backup-hours quote
Port enforcementThe Energy Commission tightened surveillance at Tema in 2026 after finding regulated solar imports arriving without licencesPaperwork quality is now a delivery risk, not an administrative detail

That last row is the reason this page spends more space on documents than on cells. A container of lithium batteries that fails conformity assessment at Tema does not arrive late; it arrives expensive, after storage charges, re-inspection and a second shipment. Buyers who understand the EasyPass sequence before they place the order are the ones who protect their margin.

What a battery really costs landed in Tema, in cedis

Ghanaian retail listings give us a rare gift: a public reference price for exactly the products we ship. In October 2026 local listings showed 5.12 kWh lithium units at about GH¢11,999, 10.24 kWh at GH¢17,999–18,000, 16 kWh at GH¢25,999–27,000, and a complete 44 kWh home backup system at about GH¢75,000. Work backwards from those numbers and you get the importer’s real margin arithmetic.

The table below uses indicative factory bands (not a quotation), a Bank of Ghana reference rate of about GH¢11.65 per US dollar, and shows duty at both of the rates currently in circulation for HS 8507.60 — because the published sources disagree and only GRA plus your clearing agent can settle it for your consignment.

ConfigurationFOB (indicative)CIF TemaDuty 5% / 20%VAT 20%Cleared costIn cedis
51.2 V 100 Ah rack — 5.12 kWh$614$659$33 / $132$138 / $158$901 / $1,020GH¢10,500 / 11,880
51.2 V 314 Ah cabinet — 16.08 kWh$1,688$1,778$89 / $356$373 / $427$2,331 / $2,651GH¢27,150 / 30,880
30 kW / 64 kWh cabinet$8,000$8,450$422 / $1,690$1,774 / $2,028$10,797 / $12,318GH¢125,800 / 143,500
125 kW / 261 kWh liquid-cooled$35,235$36,435$1,822 / $7,287$7,651 / $8,744$46,228 / $52,786GH¢538,600 / 615,000

Read the second row carefully. A 16 kWh pack lands at GH¢27,150 with 5% duty, and local retail sits at GH¢25,999–27,000. That near-exact parity is not a coincidence and it is not good news for anyone planning to arbitrage small packs: it tells you the effective tax load on imported 8507.60 in practice is closer to the 5–10% range than the 20% worst case, and it tells you the shelf price of a 5–16 kWh unit is already close to import parity. The margin in Ghana is in volume and in project supply, not in marking up retail cells.

Which is why our Ghana conversations start with the C&I cabinets. A 64 kWh cabinet carries the same paperwork as a pallet of small packs but several times the revenue per shipment, and the customer — a hotel, a clinic, a plastics plant — is buying avoided diesel and avoided downtime rather than comparing shelf prices.

The duty and tax lines, source by source

Ghana’s treatment of solar equipment is not one rule, it is four, and they do not move together:

  • Solar modules: generally 0% import duty with VAT exempt treatment — this is why panel prices in Ghana track global markets closely.
  • Complete solar home systems / kits: reported at around 5% duty in donor-sector guidance, treated differently from loose components.
  • Lithium batteries under HS 8507.60: the split. A 2023 GIZ guidance document states 20% duty with no VAT relief for batteries; trade-data analysis published in 2026 estimates 5–10%. We quote both scenarios and let your broker confirm against the current GRA tariff.
  • VAT: since the VAT Act 1151 took effect on 1 January 2026, the standard rate is 15% plus NHIL 2.5% plus GETFund 2.5% — an effective 20% on the duty-paid value. Whether your battery line qualifies for solar exemption is the single highest-value question to put to your clearing agent before you finalise a landed-cost model.

If your consignment is VAT-exempt, take the VAT column out of the table above: that is GH¢1,600 on a 16 kWh pack and GH¢17,700 on a 261 kWh cabinet — usually the difference between a project that clears the internal hurdle rate and one that does not.

GSA EasyPass: what changed on 1 July 2026

Ghana Standards Authority published its EasyPass notice to importers in May 2026, launched the programme on 1 June 2026 and made application mandatory from 1 July 2026, measured by date of shipment. Scope is defined by HS code and includes chapter 85, which covers 8507 — batteries. This is the compliance item most likely to stop a first-time Ghana shipment, and it is filed by the exporter, not by you.

StepWho actsWhat is required
Request for Certificate (RFC)Exporter — EverRayFiled with the final invoice; a proforma is accepted at the pre-production stage
Conformity documentsExporter — EverRayTest reports and quality certificates for the exact model being shipped, plus UN38.3 test summary and MSDS for lithium cargo
Standards appliedGSAHierarchy is Ghanaian, then international, then European, then national, then manufacturer specification
MarkingManufacturerLabels and instructions in at least English; model, ratings and warnings legible on the unit
Control testingGSAIf conformity documents are missing or unacceptable, testing in an ISO 17025 laboratory applies — at your cost and your schedule

Two practical consequences. First, UN38.3 and MSDS are shipping documents for Class 9 dangerous goods — they are not conformity documents and they do not substitute for an EasyPass certificate. Keep the two lists separate when you brief your forwarder and your broker. Second, documents only count if they name your model. A generic “our batteries are CE certified” statement is worth nothing at Tema; a test report carrying the model number on the invoice is worth everything.

The second regulation most suppliers ignore: LI 2452

The Energy Commission’s Renewable Energy (Standards and Labelling) (Renewable Energy Batteries) Regulations, 2022 — LI 2452 — came into force on 2 November 2022 with a one-year transition. It applies to renewable energy batteries imported for display, sale or use regardless of size, and it is a minimum performance standard, not a labelling formality. Public summaries are clear on scope and less clear on the model-registration mechanics, so treat this as an open item: confirm with the Energy Commission whether your battery model requires registration before sale, and ask us for the model-specific test pack in the same email. Any supplier who cannot produce model-level test reports at quotation stage is telling you something.

Sizing for dumsor: three worked configurations

The sizing question in Ghana is not “how much solar do I need” but “how many hours of which loads must survive the outage”. The arithmetic is deliberately simple:

Usable kWh = critical load (kW) × hours of autonomy ÷ depth of discharge. With LiFePO4 at 90% DoD and 95% inverter efficiency, divide by about 0.85 and you have the nameplate you must buy.

SiteCritical load × hoursNameplate neededConfiguration we would quote
Home or clinic3 kW × 6 hAbout 21 kWhOne 51.2 V 314 Ah cabinet (16 kWh) plus expansion, or two 5.12 kWh racks for staged budget
Hotel or guesthouse30 kW × 4 hAbout 141 kWhTwo 30 kW / 64 kWh cabinets in parallel (128 kWh), or one 125 kW / 261 kWh cabinet if peak load is higher than 60 kW
Factory, cold store or water utility200 kW × 2.5 hAbout 588 kWhTwo 261 kWh liquid-cooled cabinets, or one 20 ft containerized BESS

Then convert hours into money with your own numbers, because Ghanaian fuel and tariff figures move and a generic payback claim is worthless to a finance director:

Monthly saving = kWh shifted per day × 30 × (your diesel cost per kWh − your grid or solar cost per kWh). A 64 kWh cabinet cycling 50 kWh a day saves roughly $300 a month at a 20 cent spread and about $525 at 35 cents. Put your real diesel invoice next to that formula and the decision makes itself.

What we supply, and the supply terms

Everything ships 230/400 V, 50 Hz — Ghana uses the standard European configuration, so there is no frequency conversion, no split-phase workaround and no re-rated inverter. That also means the same BOM you approve today can be repeated for Togo, Benin and Nigeria without re-engineering.

Product lineRangeMOQProduction and dispatch
Solar modules440–735 W, N-type TOPCon and HJT dual glass1 pallet1–2 weeks
Hybrid inverters2–150 kW, single and three phase1 unit1–2 weeks
LiFePO4 batteries12.8–76.8 V, 100–314 Ah, rack and wall mount1 unit1–2 weeks
Home energy storage3–60 kWh, integrated inverter options1 set1–2 weeks
Commercial cabinets30 kW–500 kW, liquid-cooled to 261 kWh per cabinet1 set1–2 weeks
Containerized BESS20 and 40 ft, 500 kWh to 5 MWh1 set2–4 weeks

Lead times above are for standard configurations. Private-label branding, non-standard BMS protocols or bespoke enclosure work extend production to 2–4 weeks, and we will say so before you sign rather than after. All lithium products ship with UN38.3 and MSDS; CE and IEC test reports are supplied per model; the EasyPass request for certificate is filed by us against your invoice.

Ghana references, and what sits behind them

Two systems we can talk about by number:

  • 30 kW / 100 kWh hybrid system, 2025 — 52 × 570 W modules, one 30 kW hybrid inverter, 100 kWh lithium battery. This is the configuration most Ghanaian commercial enquiries converge on.
  • 450 kW / 460 kWh commercial system, 2025 — 700 × 610 W modules, 450 kW hybrid inverter, 460 kWh lithium battery. Project-scale proof that the same factory supplies beyond cabinet size.

Regionally: a 2 MW / 8 MWh containerized fleet in Zambia, a 50 kW / 75 kWh system in Zambia, and installations in Mali, Madagascar and Côte d’Ivoire. Group-wide, 83 projects in 52 countries, 42.3 MW of solar and over 1 GWh of storage — full capacities are listed on our projects page.

Shipping, payment and paperwork to Tema

We quote FOB, CIF Tema or DDP, with every cost line shown separately so your broker can compare like with like. Sea freight from Shanghai or Ningbo to Tema typically runs 30–38 days port to port; cabinets move as LCL or in a shared container depending on volume, and a single 261 kWh cabinet does not justify a full container on its own.

Ghana requires a local declarant, so clearance is done by your licensed broker — we prepare the commercial invoice, packing list, UN38.3 test summary, MSDS and the EasyPass request for certificate, and we align the invoice description with the HS code you intend to declare. Get that code in writing before production: retrofitting an invoice description after the container has sailed is the most common avoidable cost in this trade.

Payment terms are 30% deposit with balance against the bill of lading for first orders, and we will discuss LC at sight or escrow for container volumes. Distributors ordering repeatedly move to shorter terms after two clean shipments — we would rather earn that than ask for it up front.

If you are comparing us with a local stockist, the comparison that matters is not price per unit but price per delivered kWh inside your customer’s building: their landed cost plus their margin against ours plus freight plus duty. Ask both sides for that number, on the same HS code, on the same day.

Frequently asked questions

What is the import duty on lithium batteries in Ghana?

Sources disagree and you should not plan on a single number. A 2023 GIZ guidance document states 20% duty on batteries with no VAT relief; 2026 trade-data analysis estimates 5–10%. Our landed-cost table shows both. Confirm the rate for HS 8507.60 with the Ghana Revenue Authority and your clearing agent before you commit to a retail price.

Is GSA EasyPass required for battery shipments to Ghana?

Yes. EasyPass became mandatory from 1 July 2026 for shipments in scope, defined by HS code and including chapter 85. The exporter files the Request for Certificate with the invoice and model-level test reports; the Ghana Standards Authority may require ISO 17025 control testing if the documents are missing or unacceptable. We file the RFC as part of every Ghana order.

Do I need a different inverter for Ghana?

No. Ghana runs 230 V single phase and 400 V three phase at 50 Hz, which is the standard European configuration our inverters ship in. The 60 Hz markets in our range are the Philippines, Ecuador and the Bahamas; Ghana is not one of them.

How long does delivery to Tema take?

Production and dispatch are 1–2 weeks for stock configurations, then 30–38 days of sea freight port to port, plus clearance. A first order that must arrive before a committed commissioning date should be placed with 8–10 weeks of float, and we will tell you honestly if your date is not achievable rather than book it and hope.

What is the minimum order for a Ghanaian distributor?

One pallet of modules, one unit of inverters or batteries, one set of home storage or commercial cabinets. There is no container minimum to start, because a distributor validating demand in Accra or Kumasi should test the market with a mixed pallet, not a 40 ft container of one SKU.

Can you size a system for my load profile?

Yes, and it is the fastest way to get a real number. Send the critical load list in kW, the hours each must run through an outage, your peak demand and any existing generator capacity. We return a configuration, a bill of materials and an FOB/CIF price with duty and VAT left visible rather than buried.

Do you have references in Ghana?

Two: a 30 kW / 100 kWh hybrid system delivered in 2025 (52 × 570 W modules, 30 kW hybrid inverter, 100 kWh lithium battery) and a 450 kW / 460 kWh commercial system in the same year (700 × 610 W modules, 450 kW hybrid inverter, 460 kWh battery). Regional references include a 2 MW / 8 MWh containerized fleet in Zambia and installations in Mali, Madagascar and Côte d’Ivoire.

Are you a manufacturer or a trading company?

Both, and we do not hide it: EverRay is our own brand, produced across a vetted manufacturing base with our own engineering and quality control, and we ship as one supplier for modules, inverters, batteries and cabinets. If your procurement rules require an audited factory file, we arrange third-party audits, we host buyer factory visits with our engineers, and we will sign a non-solicitation agreement before any plant is named.

Send your load profile, target commissioning date and the HS code you intend to declare — we will come back with a configuration, a landed cost to Tema with duty and VAT shown as separate lines, and the document pack your broker needs. WhatsApp +86 183-5694-3951 or use the form below.

Please enable JavaScript in your browser to complete this form.
Name *
Loading

Get the 2026 EverRay Product Catalogue

25 pages · solar modules 440-735W, hybrid inverters 2-150kW, LiFePO4 batteries, home & C&I energy storage, solar pumps, lighting and PV cleaning

Download the CatalogueWhatsApp us
WhatsApp Email Get Quote
EverRay Solar

One-stop procurement of PV modules, hybrid inverters, LiFePO4 batteries and energy storage systems — backed by 20+ vetted factories and delivering to 50+ countries since 2021.

CE · IEC · UL · UL9540 CERTIFIED LINES

Privacy Policy · Terms of Use

Product Lines
  • Solar Modules 440–735W
  • Hybrid Inverters 2–150kW
  • LiFePO4 Batteries
  • Home Energy Storage 3–60kWh
  • Commercial ESS 30kW–500kW
  • Solar Pump Systems
  • EV Chargers 3.5–320kW
  • Solar Lighting
  • PV Cleaning Machines
Contact Us
  • WhatsApp / Phone: +86 183 5694 3951
  • Email: info@everraysolar.com
  • Hefei Henghui New Energy Co., Ltd
  • Room 710, Building A1, Shangze Times Square,
  • Lianhua Community, Econ. & Tech. Development Zone,
  • Hefei City, Anhui Province, China
  • Mon–Sat · 8:30–18:30 (GMT+8)

Get a Free Quote →

Follow Us

Copyright © 2026 EverRay Solar.

Theme: Oceanly Green by ScriptsTown